Sailing Supernovavideo
62 foot catamaran refit! We need to finish! [Ep. 115]
10. oktober 2025 · 39 min · 36K visninger · Mallorca
Hva denne videoen dekker
The crew of the 62-foot catamaran Supernova performs an intensive hull and rudder refit at a boatyard in Mallorca.Watch To address significant hull damage and corrosion, the team hires local contractors for prep work while Yvette and Darcy manage painting, mechanical repairs, and system maintenance.2:02 They apply International Yacht Coatings’ Gelshield Protect epoxy primer to fiberglass patches to prevent osmosis, followed by a vinyl primer to ensure compatibility with existing bottom paint.7:03 Mechanical tasks include replacing rudder cylinders, installing six new underwater lights, and machining a new prop shaft coupling.21:21 The team also removes old vinyl wrap from the topsides and prepares the hull for a new paint finish.4:24 They successfully source a local welding shop to repair a split rudder and confirm the fit of new rudder bearings sourced from Denmark.8:30 To manage the workload, the crew uses an orca-deterrent pole as a makeshift tool to dislodge a stubborn bearing.20:58 The refit remains on a strict timeline, requiring long workdays and coordination with local trades to complete repairs before the vessel’s scheduled relaunch.9:29
Mer fra Sailing Supernova
Fra Sailing Supernova – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



