Sailing Supernovavideo

62 foot catamaran refit! We need to finish! [Ep. 115]

October 10, 2025 · 39 min · 35K views · Mallorca

What this video covers

The crew of the 62-foot catamaran Supernova performs an intensive hull and rudder refit at a boatyard in Mallorca.Watch To address significant hull damage and corrosion, the team hires local contractors for prep work while Yvette and Darcy manage painting, mechanical repairs, and system maintenance.2:02 They apply International Yacht Coatings’ Gelshield Protect epoxy primer to fiberglass patches to prevent osmosis, followed by a vinyl primer to ensure compatibility with existing bottom paint.7:03 Mechanical tasks include replacing rudder cylinders, installing six new underwater lights, and machining a new prop shaft coupling.21:21 The team also removes old vinyl wrap from the topsides and prepares the hull for a new paint finish.4:24 They successfully source a local welding shop to repair a split rudder and confirm the fit of new rudder bearings sourced from Denmark.8:30 To manage the workload, the crew uses an orca-deterrent pole as a makeshift tool to dislodge a stubborn bearing.20:58 The refit remains on a strict timeline, requiring long workdays and coordination with local trades to complete repairs before the vessel’s scheduled relaunch.9:29

Watch on YouTube

More from Sailing Supernova

Hurricane prep gone wrong [Ep. 164]Sep 2026Saying goodbye is never easy [Ep. 163]Sep 2026We found the best secret spot! [Ep. 162]Sep 2026This place is a postcard! [Ep. 161]Aug 2026

From Sailing Supernova — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue