sailing.directory
KanalerBåterSpørOm
🇳🇴
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Logg inn
sailing.directory

En indeks over seilkanaler på YouTube — søkbar etter tema, navigerbar etter interesse. Nye kanaler og båter, indeksert ukentlig. Ingen støy.

Utforsk

KanalerBåterSøkOmForeslå en kanal

Skapere og juss

Støtt ossFor skaperePersonvernVilkårDMCA

Ikke navigasjonsråd · © 2026

HjemKanalerBåter

Mer

SøkSpørOmStøtt ossFor skapereLogg inn

Språk

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Visningsmodus

sailing.directory
KanalerBåterSpørOm
🇳🇴
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Logg inn

Catamaran Mistertong · video

#223 Bow repaired, passports extended, and davit put back in place…

2. juni 2026 · 48 min · 8K visninger · Hillsborough, Carriacou

Solar panel frame reinstalled on catamaran under blue sky

Se på YouTube

Hva denne videoen dekker

Around day 77–78 of a haul-out refit, Djé and Nad complete three significant tasks on their Outremer catamaran at a boatyard in Carriacou: closing the bow (étrave) repair, raising the solar panel arch, and reinstalling the davit arch (bossoir).▶ 8:10 The bow repair involves gluing and screwing a plywood board over the hull opening, then laying fiberglass cloth with peel ply over it; full fairing and mastic work remain for the following day.▶ 15:45 The solar panel arch frame is raised 60 cm using salvaged aluminum tube welded by a local fabricator named Marco, then rigged up with halyards and a topping lift before dropping into place without adjustment — seven rivets per side.▶ 2:24 Passport extensions are handled at Hillsborough, Carriacou, at the immigration and treasury buildings: the process takes under an hour and costs a fee paid at a separate government cashier, granting a two-month extension to July 11, valid also for Grenada.▶ 11:21 A marina access dispute — a broken fence blocking boat transport — remains unresolved after roughly a month, with the responsible party unreachable.▶ 7:30 Remaining work includes sealing other hull penetrations, reinforcing two nacelle beams, modifying both transoms, repairing rotten wood on the sterns, and fixing a port-side engine compartment bulkhead.▶ 41:38

Mer fra Catamaran Mistertong

#233 The modification that changes everythingjuli 2026#229 On a fait une erreur, l’ancre ne passe pas juni 2026#228 Is this the start of another job??juni 2026#226 It’s looking good... we’re starting the first coats of paint!!!juni 2026

Fra Catamaran Mistertong – se kanalens båt, mannskap og alle analyserte videoer.

Rapporter et problem
HjemKanalerBåter

Mer

SøkSpørOmStøtt ossFor skapereLogg inn

Språk

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Visningsmodus

sailing.directory

En indeks over seilkanaler på YouTube — søkbar etter tema, navigerbar etter interesse. Nye kanaler og båter, indeksert ukentlig. Ingen støy.

Utforsk

KanalerBåterSøkOmForeslå en kanal

Skapere og juss

Støtt ossFor skaperePersonvernVilkårDMCA

Ikke navigasjonsråd · © 2026