sailing.directory
CanaisBarcosPerguntarSobre
🇧🇷
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Entrar
sailing.directory

Um índice dos canais de vela no YouTube — buscável por tema, navegável por interesse. Novos canais e barcos, indexados toda semana. Sem ruído.

Explorar

CanaisBarcosBuscarSobreSugerir um canal

Criadores e informações legais

ApoiarPara criadoresPrivacidadeTermosDMCA

Não é um conselho de navegação · © 2026

InícioCanaisBarcos

Mais

BuscarPerguntarSobreApoiarPara criadoresEntrar

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de exibição

sailing.directory
CanaisBarcosPerguntarSobre
🇧🇷
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Entrar

Catamaran Mistertong · vídeo

#223 Bow repaired, passports extended, and davit put back in place…

2 de junho de 2026 · 48 min · 8K visualizações · Hillsborough, Carriacou

Solar panel frame reinstalled on catamaran under blue sky

Assistir no YouTube

O que este vídeo aborda

Around day 77–78 of a haul-out refit, Djé and Nad complete three significant tasks on their Outremer catamaran at a boatyard in Carriacou: closing the bow (étrave) repair, raising the solar panel arch, and reinstalling the davit arch (bossoir).▶ 8:10 The bow repair involves gluing and screwing a plywood board over the hull opening, then laying fiberglass cloth with peel ply over it; full fairing and mastic work remain for the following day.▶ 15:45 The solar panel arch frame is raised 60 cm using salvaged aluminum tube welded by a local fabricator named Marco, then rigged up with halyards and a topping lift before dropping into place without adjustment — seven rivets per side.▶ 2:24 Passport extensions are handled at Hillsborough, Carriacou, at the immigration and treasury buildings: the process takes under an hour and costs a fee paid at a separate government cashier, granting a two-month extension to July 11, valid also for Grenada.▶ 11:21 A marina access dispute — a broken fence blocking boat transport — remains unresolved after roughly a month, with the responsible party unreachable.▶ 7:30 Remaining work includes sealing other hull penetrations, reinforcing two nacelle beams, modifying both transoms, repairing rotten wood on the sterns, and fixing a port-side engine compartment bulkhead.▶ 41:38

Mais de Catamaran Mistertong

#233 The modification that changes everythingjul. de 2026#229 On a fait une erreur, l’ancre ne passe pas jun. de 2026#228 Is this the start of another job??jun. de 2026#226 It’s looking good... we’re starting the first coats of paint!!!jun. de 2026

De Catamaran Mistertong — veja o barco, a tripulação e cada vídeo analisado do canal.

Reportar um problema
InícioCanaisBarcos

Mais

BuscarPerguntarSobreApoiarPara criadoresEntrar

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de exibição

sailing.directory

Um índice dos canais de vela no YouTube — buscável por tema, navegável por interesse. Novos canais e barcos, indexados toda semana. Sem ruído.

Explorar

CanaisBarcosBuscarSobreSugerir um canal

Criadores e informações legais

ApoiarPara criadoresPrivacidadeTermosDMCA

Não é um conselho de navegação · © 2026