BoatworksTodayvideo
First Boat Project Of The Year Was A FAIL :-/
9. januar 2022 · 24 min · 40K visninger
Hva denne videoen dekker
A 1972 Bertram Moppy 25 undergoing a twin-inboard to twin-outboard conversion requires transom reinforcement to handle the concentrated stresses of an Armstrong bracket.0:41 The original transom design lacks the structural integrity to support the weight and leverage of outboards.1:08 To address low spots and achieve a uniform curvature for mounting a Kusa core panel, the repair requires a structural fill.4:12 A simple jig made of quarter-inch hardboard and a dowel identifies areas needing up to a quarter-inch of build.7:22 A 24-ounce batch of epoxy thickened with milled glass fibers for strength and silica for body is applied to the transom.12:24 The mixture sags during the curing process, creating runs and requiring additional surface correction.17:32 Using slow hardener provides necessary working time for large batches, though smaller, sequential applications may prevent sagging in vertical applications.12:34
Mer fra BoatworksToday
Fra BoatworksToday – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



