Sampson Boat Covideo

Patrick takes over.

4. november 2023 · 14 min · 407K visninger

Hva denne videoen dekker

Patrick leads the construction and installation of hanging lockers in the galley of the Tally Ho.0:27 The process begins with a full-scale mock-up to determine cabinet height and outboard depth relative to the countertop.1:12 Patrick fabricates vertical bulkheads to bear the structural load, followed by a cherry face frame designed to accommodate the hull's curvature and existing deck beams.1:31 The assembly requires notching the frame to clear a structural tie rod.6:33 Once the dry fit is confirmed, the team disassembles the unit for finishing: all plywood components receive an epoxy coating to prevent moisture ingress, interior surfaces are painted with Marshall's Cove white paint, and cherry elements are varnished.9:35 The completed galley includes a custom teak dowel drying rack for ceramic plates and adjustable shelving for storage.13:11 Leo Goolden returns from a trip to the United Kingdom to oversee the final installation and prepare for the upcoming mast-stepping process.13:38

Se på YouTube

Mer fra Sampson Boat Co

Sailing through the "Needles"okt. 2026Sailing the British South coast!sep. 2026Tally Ho meets a tidal mud-berth!sep. 2026Tally Ho sails into England after 59 years overseas!aug. 2026

Fra Sampson Boat Co – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem