Sampson Boat Covideo
Patrick takes over.
4 November 2023 · 14 min · 407K views
What this video covers
Patrick leads the construction and installation of hanging lockers in the galley of the Tally Ho.0:27 The process begins with a full-scale mock-up to determine cabinet height and outboard depth relative to the countertop.1:12 Patrick fabricates vertical bulkheads to bear the structural load, followed by a cherry face frame designed to accommodate the hull's curvature and existing deck beams.1:31 The assembly requires notching the frame to clear a structural tie rod.6:33 Once the dry fit is confirmed, the team disassembles the unit for finishing: all plywood components receive an epoxy coating to prevent moisture ingress, interior surfaces are painted with Marshall's Cove white paint, and cherry elements are varnished.9:35 The completed galley includes a custom teak dowel drying rack for ceramic plates and adjustable shelving for storage.13:11 Leo Goolden returns from a trip to the United Kingdom to oversee the final installation and prepare for the upcoming mast-stepping process.13:38
More from Sampson Boat Co
From Sampson Boat Co — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



