Acorn To Arabellavideo
Pitching, Scraping and Oiling the Deck | Preparing Arabella for Sea Again
5. juni 2026 · 30 min · 33K visninger · Corner Brook, Canada
Hva denne videoen dekker
Steve maintains the pine deck of the 38-ft schooner *Arabella* in Corner Brook, Newfoundland, by repairing pitch seams and scraping wood surfaces.Watch To address leaking seams caused by heat-induced bubbling during southern passages, he cleans debris from gaps using a vacuum and reefing hook before melting and pouring fresh pitch.3:33 He uses a hot plate and two small cast-iron pots to manage the pitch, applying it in thin layers and scraping the excess once cooled.7:56 For deck maintenance, he employs a scalloped-blade scraper for initial passes and a handmade scraper for finishing, frequently sharpening the blades with a file to maintain efficiency.12:27
Additionally, Steve reinforces the chafe protection on the boat's anchor pennant.15:09 He installs a section of fire hose over the nylon line at the shackle wear point, securing it with heavy-duty whipping and stitching using a sewing palm.16:03 He notes that the anchor pennant attaches to a master point on the stem to prevent fouling the bobstay.15:12 These tasks serve as interim projects while awaiting warmer weather for major painting and rigging work.0:20
Mer fra Acorn To Arabella
Fra Acorn To Arabella – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



