Acorn To Arabellavídeo

Pitching, Scraping and Oiling the Deck | Preparing Arabella for Sea Again

5 de junho de 2026 · 30 min · 34K visualizações · Corner Brook, Canada

O que este vídeo aborda

Steve maintains the pine deck of the 38-ft schooner *Arabella* in Corner Brook, Newfoundland, by repairing pitch seams and scraping wood surfaces.Watch To address leaking seams caused by heat-induced bubbling during southern passages, he cleans debris from gaps using a vacuum and reefing hook before melting and pouring fresh pitch.3:33 He uses a hot plate and two small cast-iron pots to manage the pitch, applying it in thin layers and scraping the excess once cooled.7:56 For deck maintenance, he employs a scalloped-blade scraper for initial passes and a handmade scraper for finishing, frequently sharpening the blades with a file to maintain efficiency.12:27

Additionally, Steve reinforces the chafe protection on the boat's anchor pennant.15:09 He installs a section of fire hose over the nylon line at the shackle wear point, securing it with heavy-duty whipping and stitching using a sewing palm.16:03 He notes that the anchor pennant attaches to a master point on the stem to prevent fouling the bobstay.15:12 These tasks serve as interim projects while awaiting warmer weather for major painting and rigging work.0:20

Assistir no YouTube

Mais de Acorn To Arabella

We Stripped Our Wooden Sailboat Back to Bare Wood... Againout. de 2026Saying Goodbye to Newfoundland—and the Man Who Inspired Arabellaset. de 2026Upgrading the Rudder and Another Trek To The Cliffago. de 2026We're Climbing a Wall No One Has Ever Climbed Before | Rock Climbing on Newfoundland's South Coastjul. de 2026

De Acorn To Arabella — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema