sailing.directory
CanaisBarcosPerguntarSobre
🇧🇷
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Entrar
sailing.directory

Um índice dos canais de vela no YouTube — buscável por tema, navegável por interesse. Novos canais e barcos, indexados toda semana. Sem ruído.

Explorar

CanaisBarcosBuscarSobreSugerir um canal

Criadores e informações legais

ApoiarPara criadoresPrivacidadeTermosDMCA

Não é um conselho de navegação · © 2026

InícioCanaisBarcos

Mais

BuscarPerguntarSobreApoiarPara criadoresEntrar

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de exibição

sailing.directory
CanaisBarcosPerguntarSobre
🇧🇷
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Entrar

Acorn To Arabella · vídeo

Pitching, Scraping and Oiling the Deck | Preparing Arabella for Sea Again

5 de junho de 2026 · 30 min · 33K visualizações · Corner Brook, Canada

Assistir no YouTube

O que este vídeo aborda

Steve maintains the pine deck of the 38-ft schooner *Arabella* in Corner Brook, Newfoundland, by repairing pitch seams and scraping wood surfaces.▶ 0:00 To address leaking seams caused by heat-induced bubbling during southern passages, he cleans debris from gaps using a vacuum and reefing hook before melting and pouring fresh pitch.▶ 3:33 He uses a hot plate and two small cast-iron pots to manage the pitch, applying it in thin layers and scraping the excess once cooled.▶ 7:56 For deck maintenance, he employs a scalloped-blade scraper for initial passes and a handmade scraper for finishing, frequently sharpening the blades with a file to maintain efficiency.▶ 12:27 Additionally, Steve reinforces the chafe protection on the boat's anchor pennant.▶ 15:09 He installs a section of fire hose over the nylon line at the shackle wear point, securing it with heavy-duty whipping and stitching using a sewing palm.▶ 16:03 He notes that the anchor pennant attaches to a master point on the stem to prevent fouling the bobstay.▶ 15:12 These tasks serve as interim projects while awaiting warmer weather for major painting and rigging work.▶ 0:20

Mais de Acorn To Arabella

Fjord Hopping | Arabella Sails East Toward The Nuddickjul. de 2026Replacing Victoria's 100+ Year Old Mahogany Transomjun. de 2026Haul Out, Paint, Launch | Arabella Heads for Newfoundland's South Coastjun. de 2026Back to the Woods That Built Arabellajun. de 2026

De Acorn To Arabella — veja o barco, a tripulação e cada vídeo analisado do canal.

Reportar um problema
InícioCanaisBarcos

Mais

BuscarPerguntarSobreApoiarPara criadoresEntrar

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de exibição

sailing.directory

Um índice dos canais de vela no YouTube — buscável por tema, navegável por interesse. Novos canais e barcos, indexados toda semana. Sem ruído.

Explorar

CanaisBarcosBuscarSobreSugerir um canal

Criadores e informações legais

ApoiarPara criadoresPrivacidadeTermosDMCA

Não é um conselho de navegação · © 2026