Sailing SV Delosvideo
Fit or FAIL 𫣠Building Our Own Aluminum Catamaran Pt. 85
4. september 2026 · 20 min · 175K visninger
Hva denne videoen dekker
The crew installs custom Corian countertops in the galley of their aluminum catamaran, joining three separate sections with acrylic resin adhesive and suction clamps to create a seamless finish.5:10 The installation requires precise routing for outlets and tap holes, with the Corian bonded to a lightweight white substrate to reduce weight.2:54 Simultaneously, the crew redesigns a folding interior table to accommodate fixed floor pedestals and a nearby helm seat, opting to reduce the table's depth to improve ergonomics and movement through the space.15:22
Separately, the crew troubleshoots a NMEA 2000 network experiencing low voltage at the port bow, where a meter reads 10.1 volts across a 90-meter cable run.13:08 To stabilize the network, they install a second power T closer to the load and insert a power isolator in the starboard engine room to split the power feed while maintaining data continuity.14:23 This adjustment increases the bus voltage to 12.8 volts.16:43 Proper power distribution and voltage monitoring prevent intermittent equipment failures on long NMEA 2000 network runs.
Mer fra Sailing SV Delos
Fra Sailing SV Delos â se kanalens bĂ„t, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Ăn e-post med flĂ„tens beste funn â Ăžyeblikkene, bĂ„tene og historiene som er verdt din seertid. Skriv inn din egen adresse for Ă„ fĂ„ din egen kopi.



