Sailing SV Delosvídeo
Fit or FAIL 🫣 Building Our Own Aluminum Catamaran Pt. 85
4 de setembro de 2026 · 20 min · 175K visualizações
O que este vídeo aborda
The crew installs custom Corian countertops in the galley of their aluminum catamaran, joining three separate sections with acrylic resin adhesive and suction clamps to create a seamless finish.5:10 The installation requires precise routing for outlets and tap holes, with the Corian bonded to a lightweight white substrate to reduce weight.2:54 Simultaneously, the crew redesigns a folding interior table to accommodate fixed floor pedestals and a nearby helm seat, opting to reduce the table's depth to improve ergonomics and movement through the space.15:22
Separately, the crew troubleshoots a NMEA 2000 network experiencing low voltage at the port bow, where a meter reads 10.1 volts across a 90-meter cable run.13:08 To stabilize the network, they install a second power T closer to the load and insert a power isolator in the starboard engine room to split the power feed while maintaining data continuity.14:23 This adjustment increases the bus voltage to 12.8 volts.16:43 Proper power distribution and voltage monitoring prevent intermittent equipment failures on long NMEA 2000 network runs.
Mais de Sailing SV Delos
De Sailing SV Delos — veja o barco, a tripulação e cada vídeo analisado do canal.
The Sailing Directory Newsletter
Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.



