Sailing Miragevideo
Preparing Mirage: Boat Repairs, Upgrades & a Chesapeake Bay Test Sail to Hooper Island
7. august 2026 · 21 min · Hooper Island
Hva denne videoen dekker
The owner of the 40-ft catamaran Mirage performs extensive maintenance and system upgrades in preparation for future passages. Key technical repairs include replacing the watermaker’s control board to calibrate the freshwater flush cycle, which prevents membrane damage caused by residual freshwater in the system.4:21 The crew replaces the depth and speed sensors, troubleshooting a wiring error where the ground and signal wires were previously crossed.15:43 Additional electrical work involves replacing a corroded connector in the forward cabin lighting circuit and installing a new windlass motor and gearbox assembly sourced from an open-box inventory.11:36
Deck maintenance includes refinishing teak surfaces with oil, repairing the dinghy, and replacing a cracked anchor chain deck plate.9:49 The owner upgrades the gennaker furler connector to a waterproof, high-current model and constructs a new anchor bridle with a longer, reinforced design to reduce chafe.3:21 Lifestyle upgrades include a portable, battery-operated pressure washer and a set of non-stick, induction-compatible cookware.7:08 A successful test sail to Hooper Island confirms the functionality of all repaired systems, including a new portable air conditioning unit designed for hot, humid conditions.17:33
Båter i denne videoen
Mer fra Sailing Mirage
Fra Sailing Mirage – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



