Sailing Miragevideo
Preparing Mirage: Boat Repairs, Upgrades & a Chesapeake Bay Test Sail to Hooper Island
August 7, 2026 · 21 min · Hooper Island
What this video covers
The owner of the 40-ft catamaran Mirage performs extensive maintenance and system upgrades in preparation for future passages. Key technical repairs include replacing the watermaker’s control board to calibrate the freshwater flush cycle, which prevents membrane damage caused by residual freshwater in the system.4:21 The crew replaces the depth and speed sensors, troubleshooting a wiring error where the ground and signal wires were previously crossed.15:43 Additional electrical work involves replacing a corroded connector in the forward cabin lighting circuit and installing a new windlass motor and gearbox assembly sourced from an open-box inventory.11:36
Deck maintenance includes refinishing teak surfaces with oil, repairing the dinghy, and replacing a cracked anchor chain deck plate.9:49 The owner upgrades the gennaker furler connector to a waterproof, high-current model and constructs a new anchor bridle with a longer, reinforced design to reduce chafe.3:21 Lifestyle upgrades include a portable, battery-operated pressure washer and a set of non-stick, induction-compatible cookware.7:08 A successful test sail to Hooper Island confirms the functionality of all repaired systems, including a new portable air conditioning unit designed for hot, humid conditions.17:33
Boats in this video
More from Sailing Mirage
From Sailing Mirage — see the channel’s boat, crew, and every analyzed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



