Sailing Yabávideo
Building & Installing Our Stainless Steel Davits – Will They Fit? | Sailing Yabá 253
23. desember 2024 · 37 min · 70K visninger · Itajaí
Hva denne videoen dekker
The crew of Yabá installs a custom stainless steel davit system and modifies the boat’s water tank plumbing while preparing for a departure. To accommodate the new davits, the crew clears the aft deck and loosens the stays to allow welders access to the platform.21:00 The project involves welding a diamond-shaped reinforcement to the davit structure to prevent anchor rode entanglement.7:38 Simultaneously, the crew reconfigures the water tank filling system to allow a single deck-fill point to service four individual tanks.12:30 By using a series of T-joints and elbow connectors, they reduce the plumbing height from 14 centimeters to 9 centimeters, allowing the tanks to fill sequentially.16:18 A test of the new plumbing reveals a leak in a tank lid, which requires additional sealing.34:28 The crew also installs a 50-kilogram Bruce anchor as a storm reserve, secured with 200 meters of rode.7:08 Final welding on the davits remains incomplete at the end of the day, with the crew planning to finish the installation and clean the vessel the following morning.35:29
Mer fra Sailing Yabá
Fra Sailing Yabá – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



