Sailing Yabávidéo

Building & Installing Our Stainless Steel Davits – Will They Fit? | Sailing Yabá 253

23 décembre 2024 · 37 min · 70K vues · Itajaí

Ce que couvre cette vidéo

The crew of Yabá installs a custom stainless steel davit system and modifies the boat’s water tank plumbing while preparing for a departure. To accommodate the new davits, the crew clears the aft deck and loosens the stays to allow welders access to the platform.21:00 The project involves welding a diamond-shaped reinforcement to the davit structure to prevent anchor rode entanglement.7:38 Simultaneously, the crew reconfigures the water tank filling system to allow a single deck-fill point to service four individual tanks.12:30 By using a series of T-joints and elbow connectors, they reduce the plumbing height from 14 centimeters to 9 centimeters, allowing the tanks to fill sequentially.16:18 A test of the new plumbing reveals a leak in a tank lid, which requires additional sealing.34:28 The crew also installs a 50-kilogram Bruce anchor as a storm reserve, secured with 200 meters of rode.7:08 Final welding on the davits remains incomplete at the end of the day, with the crew planning to finish the installation and clean the vessel the following morning.35:29

Regarder sur YouTube

Plus de vidéos de Sailing Yabá

Flying Across the Caribbean for Yabá’s Biggest Upgrade Yet — Sailing Yabásept. 2026Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing Yabáaoût 2026Sailing to Ilha Grande: Prison Island transformed into Tropical Paradise! — Sailing Yabáaoût 2026This Anchorage Was Worth Every Miserable Mile — Sailing Yabáaoût 2026

De Sailing Yabá — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème