Sailing Squibvideo

Squib's Refit - Engine cover - Reinforcing port hull - various small projects /68

23. mai 2024 · 15 min · 881 visninger · Danube

Hva denne videoen dekker

The refit of the pocket catamaran Squib focuses on structural repairs to the port hull and the fabrication of custom engine compartment covers.0:13 To create the engine covers, three 3mm plywood panels are bonded with thickened epoxy and reinforced with custom-fitted frames.1:20 After sanding the edges and rounding corners with a handheld router, the panels are test-fitted in the port engine bilge and trimmed for clearance.3:44 Structural work in the port hull includes filling old ventilation holes from a decommissioned absorption refrigerator with epoxy and fiberglass to seal the hull against water ingress.7:28 Additional tasks involve removing old wiring and lamps in the forward cabin, filling holes in the bulkheads, and laminating the interior hull walls with fiberglass matting.8:46 Sabina and Peter also perform general maintenance, including cleaning the bilge, removing an old foot pump, and installing new bilge pump and main electrical switches.6:05 The project concludes with the removal of exterior refrigerator vent grilles and the sealing of remaining screw holes.13:33

Se på YouTube

Mer fra Sailing Squib

Sailing Squib - May 2026/3sep. 2026Sailing Squib May 2026 /2aug. 2026Sailing Squib - Contemporary Witnessjuli 2026Sailing Squib - May 2026 /1juli 2026

Fra Sailing Squib – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem