Sailing Squibvídeo

Squib's Refit - Engine cover - Reinforcing port hull - various small projects /68

23 de mayo de 2024 · 15 min · 881 visitas · Danube

Qué cubre este vídeo

The refit of the pocket catamaran Squib focuses on structural repairs to the port hull and the fabrication of custom engine compartment covers.0:13 To create the engine covers, three 3mm plywood panels are bonded with thickened epoxy and reinforced with custom-fitted frames.1:20 After sanding the edges and rounding corners with a handheld router, the panels are test-fitted in the port engine bilge and trimmed for clearance.3:44 Structural work in the port hull includes filling old ventilation holes from a decommissioned absorption refrigerator with epoxy and fiberglass to seal the hull against water ingress.7:28 Additional tasks involve removing old wiring and lamps in the forward cabin, filling holes in the bulkheads, and laminating the interior hull walls with fiberglass matting.8:46 Sabina and Peter also perform general maintenance, including cleaning the bilge, removing an old foot pump, and installing new bilge pump and main electrical switches.6:05 The project concludes with the removal of exterior refrigerator vent grilles and the sealing of remaining screw holes.13:33

Ver en YouTube

Más de Sailing Squib

Sailing Squib - May 2026/3sept 2026Sailing Squib May 2026 /2ago 2026Sailing Squib - Contemporary Witnessjul 2026Sailing Squib - May 2026 /1jul 2026

De Sailing Squib — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema