RAN Sailingvideo

Coachroof In Place & Glued In - Ep. 453 RAN Sailing

15. august 2025 · 19 min · 99K visninger · Skåne

Hva denne videoen dekker

Johan and Malin resume the boat build at Sunhill farm after a week-long vacation in Chania, Crete.1:53 The primary task involves fabricating and installing the coachroof, a project requiring 2.6 square meters of glass per side and 15 kilograms of epoxy.6:53 Johan integrates G10 inlays into the laminate to reinforce the attachment points for the D1 lower chainplates.6:59 Due to the panel's size and shape, he uses a vacuum bagging technique, joining two pieces of bagging material with tape to accommodate the dimensions.10:01 After curing, Johan levels the boat hull precisely to the waterline in all planes using a laser.17:36 He then positions the rigid coachroof panel and glues in carbon fiber deck beams to achieve a 15-millimeter crown at the centerline.15:09 The process requires extensive measurement to ensure the panel aligns correctly with the boat's geometry before final installation.14:24

Se på YouTube

Mer fra RAN Sailing

Something's Not Right Here! Building Our 52ft Sailboat - Ep. 502sep. 2026This Is Where Boat Builds Break People - Ep. 501 Ran Sailingaug. 2026Our 52ft Sailboat Build Reaches Another Milestone! - Ep. 500 Ran Sailingaug. 2026How Many Hatches Does a 52ft Sailboat Need? - Ep. 499 Ran Sailingaug. 2026

Fra RAN Sailing – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem