Classic Yacht TVvideo

Building the schooner MALABAR IV: Shaping the centreline EP04

20. mai 2025 · 9 min · 7K visninger

Hva denne videoen dekker

Ben shapes the keel and rabbet of the schooner MALABAR IV using traditional hand tools, specifically an adze and an axe.1:06 The process involves removing large amounts of timber to establish the primary structure before transitioning to finer tools for precision work.3:47 To ensure an accurate fit for the garboard plank, the builder relies on measurements taken from the loft floor.6:40 However, he leaves extra material, or "meat," at the transitions between the keel, stem, and stern post.7:22 This allowance permits final shaping in the real world once the stem and stern post are installed and a jig representing the planking can be offered up to the structure.7:34 The project faces significant challenges due to the high cost of materials and the substantial time commitment required for wooden boat construction.5:44 Success depends on balancing lofted two-dimensional data with physical adjustments during assembly.8:28

Se på YouTube

Mer fra Classic Yacht TV

EP13 Fastnet update | Interior layout: Building the schooner MALABAR IVmai 2026EP12 fitting planks: Building the schooner Malabar IVfeb. 2026EP11 shaping planks: : Building the schooner Malabar IVjan. 2026EP10 Steaming and fitting Green Oak frames: Building the schooner Malabar IVjan. 2026

Fra Classic Yacht TV – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem