MJ Sailingvideo

Jessica Gets Back to Glassing After 4 Months Away (MJ Sailing - Ep 261)

3. desember 2022 · 17 min · 40K visninger · Kent Island

Hva denne videoen dekker

Construction of a 42-foot catamaran continues with the installation of structural bulkheads and cockpit storage in the aft berth.Watch To maximize interior space and provide utility, the builders are installing custom inboard shelves along the hull, which will house LED down-lighting and USB charging ports.4:32 The team uses Nauticor honeycomb foam core for these panels, reinforced with 12-ounce double-bias fiberglass.6:43 A drainage system for the Vetus flush hatch is integrated into the hull, featuring a custom-molded drain path that exits through the side of the vessel.1:57 To maintain the integrity of the watertight aft bulkhead, electrical conduit is routed only to the necessary outlet locations rather than through the bulkhead itself.7:50 The final phase of the current project involves fairing the surfaces of bulkhead 6 and the electronic storage area, followed by applying fiberglass and peel ply to the newly installed bulkhead 7.9:11 Proper surface preparation, including sanding and cleaning with styrene, ensures a clean finish for the structural glass work.14:37

Se på YouTube

Mer fra MJ Sailing

Painting the Accent Walls On Our Home Built Catamaran (MJ Sailing - Episode 380)juli 2026The Details That Keep a Boat Dry (MJ Sailing - Episode 379)juni 2026Preparing Our Catamaran for Paint—and Me for Captain's Schooljuni 2026The Bad News: We Have To Cut This Bulkhead Out (MJ Sailing - Episode 377)mai 2026

Fra MJ Sailing – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem