MJ Sailingvideo

Jessica Gets Back to Glassing After 4 Months Away (MJ Sailing - Ep 261)

3 dicembre 2022 · 17 min · 40K visualizzazioni · Kent Island

Cosa tratta questo video

Construction of a 42-foot catamaran continues with the installation of structural bulkheads and cockpit storage in the aft berth.Watch To maximize interior space and provide utility, the builders are installing custom inboard shelves along the hull, which will house LED down-lighting and USB charging ports.4:32 The team uses Nauticor honeycomb foam core for these panels, reinforced with 12-ounce double-bias fiberglass.6:43 A drainage system for the Vetus flush hatch is integrated into the hull, featuring a custom-molded drain path that exits through the side of the vessel.1:57 To maintain the integrity of the watertight aft bulkhead, electrical conduit is routed only to the necessary outlet locations rather than through the bulkhead itself.7:50 The final phase of the current project involves fairing the surfaces of bulkhead 6 and the electronic storage area, followed by applying fiberglass and peel ply to the newly installed bulkhead 7.9:11 Proper surface preparation, including sanding and cleaning with styrene, ensures a clean finish for the structural glass work.14:37

Guarda su YouTube

Altro da MJ Sailing

Painting the Accent Walls On Our Home Built Catamaran (MJ Sailing - Episode 380)lug 2026The Details That Keep a Boat Dry (MJ Sailing - Episode 379)giu 2026Preparing Our Catamaran for Paint—and Me for Captain's Schoolgiu 2026The Bad News: We Have To Cut This Bulkhead Out (MJ Sailing - Episode 377)mag 2026

Da MJ Sailing — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema