Hold Fast!video
S/V SeaSprite Refit Update 8 September 2026
8. september 2026 · 2 min · 2K visninger · Phipps Boatworks, Harrington Harbor North, Maryland
Hva denne videoen dekker
The Sea SPRITE 30 has been moved into the Phipps Boatworks building at Harrington Harbor North, where the shrink wrap and frame have been removed and a refit is underway.0:34 The interior is being cleared out — deck hardware has been boxed up, though the box is heavy enough to require help moving, and the stove also needs assistance to remove.0:39 Some items remain aboard temporarily while Lizzie thinks through what will be needed during the project versus what can be staged off the boat.1:43 The building has a large full-building fan running, which matters given warm outside temperatures.0:26 The work is in early-stage organization: the priority is stripping unnecessary gear to give clear access for the project ahead.0:39 Phipps Boatworks is described as a well-equipped facility with the tools and resources needed for a refit of this scope.1:47
Båter i denne videoen
Mer fra Hold Fast!
Fra Hold Fast! – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



