Salt & Tarvideo
Salt & Tar: Ep.138- Leaving the dock in August
6. mai 2021 · 24 min · 100K visninger
Hva denne videoen dekker
The owners of the custom-built vessel Red Aviva install used anchor rollers purchased from Craigslist onto the bowsprit, securing them with bolts and cotter pins to prevent loosening.2:27 The project requires drilling through the bowsprit and clamping the flared metal to ensure a proper fit.3:11 The crew also mounts an inner forestay to support a self-tacking staysail, positioning it to clear the Sampson post.7:39 Interior work focuses on finalizing the dinette storage, constructing an angled bookshelf, and determining the ergonomic placement of the head.11:58 The team uses plywood templates to design the dinette area and storage cubbies.8:48 Running rigging for the gaff-rigged main is upgraded from half-inch to 5/8-inch line to improve handling comfort, while the original half-inch line is repurposed for the headsails.16:08 The crew aims to complete these final systems, including navigation lights and plumbing, to meet an August departure deadline.3:47
Mer fra Salt & Tar
Fra Salt & Tar – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



