Salt & Tarvidéo

Salt & Tar: Ep.138- Leaving the dock in August

6 mai 2021 · 24 min · 100K vues

Ce que couvre cette vidéo

The owners of the custom-built vessel Red Aviva install used anchor rollers purchased from Craigslist onto the bowsprit, securing them with bolts and cotter pins to prevent loosening.2:27 The project requires drilling through the bowsprit and clamping the flared metal to ensure a proper fit.3:11 The crew also mounts an inner forestay to support a self-tacking staysail, positioning it to clear the Sampson post.7:39 Interior work focuses on finalizing the dinette storage, constructing an angled bookshelf, and determining the ergonomic placement of the head.11:58 The team uses plywood templates to design the dinette area and storage cubbies.8:48 Running rigging for the gaff-rigged main is upgraded from half-inch to 5/8-inch line to improve handling comfort, while the original half-inch line is repurposed for the headsails.16:08 The crew aims to complete these final systems, including navigation lights and plumbing, to meet an August departure deadline.3:47

Regarder sur YouTube

Plus de vidéos de Salt & Tar

Salt & Tar: Ep.356- Dock Lifeaoût 2026Salt & Tar: Ep.355- Serenely Afloat in a Hustling Harboraoût 2026Salt & Tar: Ep.354- Enjoying the Sensation of Floatingaoût 2026Salt & Tar: Ep.353- Launch Day!août 2026

De Salt & Tar — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème