Sail Lifevideo
The road back to boat work: We're gravel rich & ready for shipping containers! Ep. 694
6. september 2026 · 21 min · 65K visninger
Hva denne videoen dekker
Mads prepares a workshop site for the arrival of a 44-foot hurricane-damaged catamaran project boat named Spiffy and two shipping containers.0:23 To create a stable foundation on clay soil, he installs geotextile fabric and covers it with ABC crushed rock, a mixture of various stone sizes and fine dust used by the North Carolina Department of Transportation for road bases.14:11 He spreads approximately 160,000 pounds of rock across a 60-by-40-foot area using a dump truck and a tractor with a box blade, then compacts the surface with a vibrator.2:18 To accommodate large delivery trailers, he extends an existing culvert pipe with a new section and widens the driveway entrance.11:03 He also installs aluminum gutters on the workshop roof to manage drainage and prevent water from pooling near the new gravel pad.16:29 A portable power station, the BlueEddy Elite 400, provides backup electricity for the workshop during frequent local power outages.5:33
Båter i denne videoen
Mer fra Sail Life
Fra Sail Life – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



