Sail Lifevideo
The road back to boat work: We're gravel rich & ready for shipping containers! Ep. 694
6 settembre 2026 · 21 min · 80K visualizzazioni
Cosa tratta questo video
Mads prepares a workshop site for the arrival of a 44-foot hurricane-damaged catamaran project boat named Spiffy and two shipping containers.0:23 To create a stable foundation on clay soil, he installs geotextile fabric and covers it with ABC crushed rock, a mixture of various stone sizes and fine dust used by the North Carolina Department of Transportation for road bases.14:11 He spreads approximately 160,000 pounds of rock across a 60-by-40-foot area using a dump truck and a tractor with a box blade, then compacts the surface with a vibrator.2:18 To accommodate large delivery trailers, he extends an existing culvert pipe with a new section and widens the driveway entrance.11:03 He also installs aluminum gutters on the workshop roof to manage drainage and prevent water from pooling near the new gravel pad.16:29 A portable power station, the BlueEddy Elite 400, provides backup electricity for the workshop during frequent local power outages.5:33
Barche in questo video
Altro da Sail Life
Da Sail Life — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



