Sailing Yabávideo
Measuring Yabá’s True Size Before the Storm Strikes — Sailing Yabá 234
3. desember 2024 · 19 min · 56K visninger
Hva denne videoen dekker
The crew of the sailboat Yabá undertakes a bathroom renovation project while anchored in Brazil. The work involves installing a new shower basin, constructing a plywood enclosure to conceal a gray water tank, and building custom shelving for toiletries using leftover purple heart wood.8:03 Ben and his partner MP measure and cut floor beams and plywood panels to fit the space, utilizing a circular saw and a 220-volt fan to manage the 30-degree Celsius heat.7:44 The project requires sealing the wall behind the shower and installing a drain system.8:29 During the work, the crew monitors local weather patterns, noting that high daytime temperatures frequently lead to afternoon thunderstorms.16:11 As a storm approaches, the crew halts outdoor cutting and varnishing, secures the boat, and shuts down electrical systems to avoid lightning damage.19:20 The renovation remains in progress, with plans to seal and fasten the structure in subsequent days.18:00
Mer fra Sailing Yabá
Fra Sailing Yabá – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



