Sailing Yabávideo
Measuring Yabá’s True Size Before the Storm Strikes — Sailing Yabá 234
3 December 2024 · 19 min · 56K views
What this video covers
The crew of the sailboat Yabá undertakes a bathroom renovation project while anchored in Brazil. The work involves installing a new shower basin, constructing a plywood enclosure to conceal a gray water tank, and building custom shelving for toiletries using leftover purple heart wood.8:03 Ben and his partner MP measure and cut floor beams and plywood panels to fit the space, utilizing a circular saw and a 220-volt fan to manage the 30-degree Celsius heat.7:44 The project requires sealing the wall behind the shower and installing a drain system.8:29 During the work, the crew monitors local weather patterns, noting that high daytime temperatures frequently lead to afternoon thunderstorms.16:11 As a storm approaches, the crew halts outdoor cutting and varnishing, secures the boat, and shuts down electrical systems to avoid lightning damage.19:20 The renovation remains in progress, with plans to seal and fasten the structure in subsequent days.18:00
More from Sailing Yabá
From Sailing Yabá — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



