Salt & Tarvideo

Salt & Tar: Episode 63-Busted Back and Metal Scrap

6. november 2019 · 21 min · 75K visninger

Hva denne videoen dekker

Construction of the cap rails for the boat involves cutting curved sections from 2x12 and 2x8 construction-grade lumber and joining them with scarfs.10:36 Rather than steam-bending the wood, which requires a steam box and high-quality timber, the process uses shorter, straight-grained pieces traced directly from the bulwarks to minimize waste and cost.15:17 The builder secures the boards with clamps, traces the required shape and scarf joints underneath, and cuts the curves using a saw.12:43 To fabricate necessary metal hardware, including bowsprit hinges, anchor rollers, and a mast collar, the crew sources used steel parts from a local salvage yard.6:29 The project also involves cleaning and epoxy-sealing screw holes in the deck planking to prevent water infiltration.0:41 The builder emphasizes that using construction-grade fir with knots provides a durable, work-boat aesthetic similar to traditional larch-built vessels.11:25

Se på YouTube

Mer fra Salt & Tar

Salt & Tar: Ep.357- Finishing What We Startedsep. 2026Salt & Tar: Ep.356- Dock Lifeaug. 2026Salt & Tar: Ep.355- Serenely Afloat in a Hustling Harboraug. 2026Salt & Tar: Ep.354- Enjoying the Sensation of Floatingaug. 2026

Fra Salt & Tar – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem