Salt & Tarvídeo

Salt & Tar: Episode 63-Busted Back and Metal Scrap

6 de novembro de 2019 · 21 min · 75K visualizações

O que este vídeo aborda

Construction of the cap rails for the boat involves cutting curved sections from 2x12 and 2x8 construction-grade lumber and joining them with scarfs.10:36 Rather than steam-bending the wood, which requires a steam box and high-quality timber, the process uses shorter, straight-grained pieces traced directly from the bulwarks to minimize waste and cost.15:17 The builder secures the boards with clamps, traces the required shape and scarf joints underneath, and cuts the curves using a saw.12:43 To fabricate necessary metal hardware, including bowsprit hinges, anchor rollers, and a mast collar, the crew sources used steel parts from a local salvage yard.6:29 The project also involves cleaning and epoxy-sealing screw holes in the deck planking to prevent water infiltration.0:41 The builder emphasizes that using construction-grade fir with knots provides a durable, work-boat aesthetic similar to traditional larch-built vessels.11:25

Assistir no YouTube

Mais de Salt & Tar

Salt & Tar: Ep.357- Finishing What We Startedset. de 2026Salt & Tar: Ep.356- Dock Lifeago. de 2026Salt & Tar: Ep.355- Serenely Afloat in a Hustling Harborago. de 2026Salt & Tar: Ep.354- Enjoying the Sensation of Floatingago. de 2026

De Salt & Tar — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema