Distant Shores TVvideo

Panama Canal with a Sailboat, Part 2 – Colon to Lake Gatun

3. august 2020 · 28 min · 80K visninger · Shelter Bay Marina

Hva denne videoen dekker

Cruising sailors preparing for a Panama Canal transit typically stage at Shelter Bay Marina, a full-service facility located at the Atlantic entrance.2:01 The 44.3-mile transit requires two days, with an overnight mooring on Lake Gatun.3:48 Before departure, vessels must undergo an official inspection, receive a ship identification number, and pay transit fees.3:59 Owners are responsible for sourcing four line handlers, training them in bowline knots, and preparing the boat by clearing decks, moving dinghies, and protecting solar panels with fenders.13:53

Upon entering the canal, a Panama Canal Authority advisor boards vessels under 65 feet to provide guidance and manage communications with lock operators.19:30 Yachts are required to raft together in groups of three while navigating the three chambers of the Gatun Locks, which lift vessels 85 feet to the lake level.21:27 Line handlers manage heavy messenger lines thrown from the shore to secure the rafted boats against the lock walls.25:22 Proper preparation and coordination with the advisor ensure a controlled ascent through the locks.

Se på YouTube

Mer fra Distant Shores TV

TransAtlantic - Cooking at Sea in Foul Weather | Ep 277aug. 2026Beware of ORCAS! Part 2: Sailing SOUTH through Orca Territory to Portugal | Ep 276juli 2026Sailing South: Dover, Storms and the Bay of Biscayjuni 2026NAVIGATING in FOG in the Busiest SHIPPING Area in the World! | Ep 273mai 2026

Fra Distant Shores TV – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem