Distant Shores TVvideo
Panama Canal with a Sailboat, Part 2 – Colon to Lake Gatun
3 de agosto de 2020 · 28 min · 80K vistas · Shelter Bay Marina
¿Qué cubre este video?
Cruising sailors preparing for a Panama Canal transit typically stage at Shelter Bay Marina, a full-service facility located at the Atlantic entrance.2:01 The 44.3-mile transit requires two days, with an overnight mooring on Lake Gatun.3:48 Before departure, vessels must undergo an official inspection, receive a ship identification number, and pay transit fees.3:59 Owners are responsible for sourcing four line handlers, training them in bowline knots, and preparing the boat by clearing decks, moving dinghies, and protecting solar panels with fenders.13:53
Upon entering the canal, a Panama Canal Authority advisor boards vessels under 65 feet to provide guidance and manage communications with lock operators.19:30 Yachts are required to raft together in groups of three while navigating the three chambers of the Gatun Locks, which lift vessels 85 feet to the lake level.21:27 Line handlers manage heavy messenger lines thrown from the shore to secure the rafted boats against the lock walls.25:22 Proper preparation and coordination with the advisor ensure a controlled ascent through the locks.
Más de Distant Shores TV
De Distant Shores TV — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



