Garrett’s Adventurevideo
Getting my Ship in Order
1. desember 2024 · 15 min · 52K visninger · Lautoka
Hva denne videoen dekker
Garrett hauls his boat out in Fiji to replace the cutlass bearing, paint the bottom, and inspect seacocks.1:47 Removing the propeller requires a prop puller and significant leverage using a backup tiller.3:55 After failing to remove the cutlass bearing with a handsaw and a reciprocating saw, he takes the stern tube to a local shop for removal.7:00 Reinstalling the stern tube proves difficult due to a stripped mounting bolt and alignment issues caused by improper gasket thickness and sealant application.10:35 He eventually achieves proper shaft alignment by dry-fitting the assembly without a gasket to confirm the fit before finalizing the seal with a thin paper gasket and washers to compensate for the damaged bolt threads.13:29 The project also includes scouting the Laotoka mangroves as a potential cyclone shelter using a drone and handheld depth sounder.5:21 Future planned maintenance includes installing a new windlass and lithium batteries.14:04
Mer fra Garrett’s Adventure
Fra Garrett’s Adventure – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



