Garrett’s Adventurevidéo

Getting my Ship in Order

1 décembre 2024 · 15 min · 52K vues · Lautoka

Ce que couvre cette vidéo

Garrett hauls his boat out in Fiji to replace the cutlass bearing, paint the bottom, and inspect seacocks.1:47 Removing the propeller requires a prop puller and significant leverage using a backup tiller.3:55 After failing to remove the cutlass bearing with a handsaw and a reciprocating saw, he takes the stern tube to a local shop for removal.7:00 Reinstalling the stern tube proves difficult due to a stripped mounting bolt and alignment issues caused by improper gasket thickness and sealant application.10:35 He eventually achieves proper shaft alignment by dry-fitting the assembly without a gasket to confirm the fit before finalizing the seal with a thin paper gasket and washers to compensate for the damaged bolt threads.13:29 The project also includes scouting the Laotoka mangroves as a potential cyclone shelter using a drone and handheld depth sounder.5:21 Future planned maintenance includes installing a new windlass and lithium batteries.14:04

Regarder sur YouTube

Plus de vidéos de Garrett’s Adventure

Fixing 87 Osmosis Blisters on my Sailboataoût 2026Running my Sailboat VERY agroundmai 2026Sailing to and Exploring Remote Islands on Australia's East Coast NSWavr. 2026Living on a Sailboat in Sydneyavr. 2026

De Garrett’s Adventure — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème