Garrett’s Adventurevidéo
Getting my Ship in Order
1 décembre 2024 · 15 min · 52K vues · Lautoka
Ce que couvre cette vidéo
Garrett hauls his boat out in Fiji to replace the cutlass bearing, paint the bottom, and inspect seacocks.1:47 Removing the propeller requires a prop puller and significant leverage using a backup tiller.3:55 After failing to remove the cutlass bearing with a handsaw and a reciprocating saw, he takes the stern tube to a local shop for removal.7:00 Reinstalling the stern tube proves difficult due to a stripped mounting bolt and alignment issues caused by improper gasket thickness and sealant application.10:35 He eventually achieves proper shaft alignment by dry-fitting the assembly without a gasket to confirm the fit before finalizing the seal with a thin paper gasket and washers to compensate for the damaged bolt threads.13:29 The project also includes scouting the Laotoka mangroves as a potential cyclone shelter using a drone and handheld depth sounder.5:21 Future planned maintenance includes installing a new windlass and lithium batteries.14:04
Plus de vidéos de Garrett’s Adventure
De Garrett’s Adventure — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



