RAN Sailingvideo

Designing Our First Deck Panels + Installing Carbon Beams - Ep. 440 RAN Sailing

9. mai 2025 · 26 min · 113K visninger · Skåne

Hva denne videoen dekker

The construction of the forward deck begins with the test-fitting and alignment of carbon fiber beams across the boat's bulkheads.3:09 To ensure structural integrity, the beams are positioned to form a straight line at the center, with a 1.5 to 2-millimeter gap left for thickened epoxy bonding.6:56 The beams, measuring 50 millimeters in height with a 2.7-meter span, show minimal deflection under load.4:57 Unidirectional carbon fiber is used to maximize longitudinal strength, rather than a weave, which provides the necessary stiffness for the deck structure.14:26 Design files for the deck panels are prepared using 3D software, incorporating cutouts for high-compressive-strength inserts—likely sapele—at the mounting points for cleats and the windlass.18:57 These inserts replace the standard PET foam core to prevent crushing under bolt loads.19:45 The project requires approximately 60 sheets of PET foam, totaling 180 square meters of material for the entire vessel.20:24 Proper alignment of beams and bulkheads ensures a flush fit for the sandwich panels before final lamination.6:45

Se på YouTube

Mer fra RAN Sailing

This Is Where Boat Builds Break People - Ep. 501 Ran Sailingaug. 2026Our 52ft Sailboat Build Reaches Another Milestone! - Ep. 500 Ran Sailingaug. 2026How Many Hatches Does a 52ft Sailboat Need? - Ep. 499 Ran Sailingaug. 2026Making Our Sailboat One Solid Structure - Ep. 498 Ran Sailingaug. 2026

Fra RAN Sailing – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem