RAN Sailingvidéo

Designing Our First Deck Panels + Installing Carbon Beams - Ep. 440 RAN Sailing

9 mai 2025 · 26 min · 113K vues · Skåne

Ce que couvre cette vidéo

The construction of the forward deck begins with the test-fitting and alignment of carbon fiber beams across the boat's bulkheads.3:09 To ensure structural integrity, the beams are positioned to form a straight line at the center, with a 1.5 to 2-millimeter gap left for thickened epoxy bonding.6:56 The beams, measuring 50 millimeters in height with a 2.7-meter span, show minimal deflection under load.4:57 Unidirectional carbon fiber is used to maximize longitudinal strength, rather than a weave, which provides the necessary stiffness for the deck structure.14:26 Design files for the deck panels are prepared using 3D software, incorporating cutouts for high-compressive-strength inserts—likely sapele—at the mounting points for cleats and the windlass.18:57 These inserts replace the standard PET foam core to prevent crushing under bolt loads.19:45 The project requires approximately 60 sheets of PET foam, totaling 180 square meters of material for the entire vessel.20:24 Proper alignment of beams and bulkheads ensures a flush fit for the sandwich panels before final lamination.6:45

Regarder sur YouTube

Plus de vidéos de RAN Sailing

This Is Where Boat Builds Break People - Ep. 501 Ran Sailingaoût 2026Our 52ft Sailboat Build Reaches Another Milestone! - Ep. 500 Ran Sailingaoût 2026How Many Hatches Does a 52ft Sailboat Need? - Ep. 499 Ran Sailingaoût 2026Making Our Sailboat One Solid Structure - Ep. 498 Ran Sailingaoût 2026

De RAN Sailing — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème