PAT | FRANKIEvideo
4 Months of Boat Work: Make-or-Break Moment for Structural Rebuild | BOAT DAMAGE DISASTER Part 10
12. januar 2025 · 10 min · 23K visninger
Hva denne videoen dekker
Frankie and Pat complete a four-month structural rebuild by reattaching the keel to their boat.7:10 The process begins by lifting the vessel into slings and removing the support stands and welded cradle.0:29 Technicians perform a precise, millimeter-level alignment of the keel to the hull, using old screws to verify the fit before installing new keel bolts.2:23 Throughout the lift and seating process, the owners monitor the hull for structural sounds or cracks.5:54 Once the keel is secured and the boat’s weight rests on it, the team applies primer and anti-fouling paint to the keel, followed by an epoxy seal.6:50 With the keel successfully mounted, the focus shifts to the interior, where the crew begins reassembling and cutting new floorboards to complete the cabin floor.8:35 The structural integrity of the rebuild remains intact after the boat is lowered onto the keel.7:47
Mer fra PAT | FRANKIE
Fra PAT | FRANKIE – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



