PAT | FRANKIEvideo

4 Months of Boat Work: Make-or-Break Moment for Structural Rebuild | BOAT DAMAGE DISASTER Part 10

January 12, 2025 · 10 min · 23K views

What this video covers

Frankie and Pat complete a four-month structural rebuild by reattaching the keel to their boat.7:10 The process begins by lifting the vessel into slings and removing the support stands and welded cradle.0:29 Technicians perform a precise, millimeter-level alignment of the keel to the hull, using old screws to verify the fit before installing new keel bolts.2:23 Throughout the lift and seating process, the owners monitor the hull for structural sounds or cracks.5:54 Once the keel is secured and the boat’s weight rests on it, the team applies primer and anti-fouling paint to the keel, followed by an epoxy seal.6:50 With the keel successfully mounted, the focus shifts to the interior, where the crew begins reassembling and cutting new floorboards to complete the cabin floor.8:35 The structural integrity of the rebuild remains intact after the boat is lowered onto the keel.7:47

Watch on YouTube

More from PAT | FRANKIE

12.5 days of REALITY crossing the Atlantic Ocean | Part 3 #sailingJun 2025Atlantic Crossing Part 2 | The Night from Hell + Discovering Cape VerdeMay 2025Leaving Everything Behind - The First 900 NM | Atlantic Crossing Part 1Apr 2025The ULTIMATE Shakedown SailFeb 2025

From PAT | FRANKIE — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue