Boating Disaster or Genius Move? The Hole That Changed Everything (19)
30. august 2025 · 24 min · 70K visninger
Hva denne videoen dekker
The crew of a project boat installs seven 200-watt flexible solar panels onto a newly constructed hardtop, utilizing acetone to prep the surface before bonding the panels with adhesive.0:40 To accommodate the boat's backstay, the installer cuts a three-inch hole through one of the 200-watt panels, sealing the penetration with a custom-modified rubber boot and sealant to prevent moisture ingress.17:43 The wiring configuration uses parallel connections across multiple MPPT controllers to mitigate power loss from shading. Despite the structural modification, the damaged panel produces over 100% of its rated wattage during peak sun hours.23:34 The installation process includes moving the backstay to a temporary cleat and rerouting wiring through conduits integrated into the hardtop's rear support legs.18:03 The project aims for total energy self-sufficiency, with additional panels planned for future installation following a full paint job.9:21
Mer fra Expedition Engineering
Fra Expedition Engineering – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



