Expedition Engineeringβίντεο
Boating Disaster or Genius Move? The Hole That Changed Everything (19)
30 Αυγούστου 2025 · 24 λεπτά · 70K προβολές
Τι καλύπτει αυτό το βίντεο
The crew of a project boat installs seven 200-watt flexible solar panels onto a newly constructed hardtop, utilizing acetone to prep the surface before bonding the panels with adhesive.0:40 To accommodate the boat's backstay, the installer cuts a three-inch hole through one of the 200-watt panels, sealing the penetration with a custom-modified rubber boot and sealant to prevent moisture ingress.17:43 The wiring configuration uses parallel connections across multiple MPPT controllers to mitigate power loss from shading. Despite the structural modification, the damaged panel produces over 100% of its rated wattage during peak sun hours.23:34 The installation process includes moving the backstay to a temporary cleat and rerouting wiring through conduits integrated into the hardtop's rear support legs.18:03 The project aims for total energy self-sufficiency, with additional panels planned for future installation following a full paint job.9:21
Περισσότερα από το Expedition Engineering
Από Expedition Engineering — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.
The Sailing Directory Newsletter
Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.



