Sailing Squibvideo

Squib's Refit - Deck work, superstructures, filling and sanding - filling in window frame corners/61

4. april 2024 · 15 min · 2K visninger

Hva denne videoen dekker

Peter performs deck repairs and surface preparation on the pocket catamaran Squib, focusing on filling stress cracks and leveling uneven areas before painting. To address stress cracks in the gelcoat caused by underlying bulkheads, he previously reinforced the areas with multiple layers of fiberglass.0:47 For the current refit, he cleans the deck with acetone and applies a filler mixture of epoxy, microballoons, and Aerosil.2:38 He uses plastic sheeting to mold and smooth the epoxy in tight corners, allowing it to cure before sanding.4:34 To ensure a flat finish, he switches from an eccentric sander to a long-base orbital sander, which prevents the creation of new depressions during the leveling process.7:10 Additionally, he fabricates and installs wooden support pedestals for deck-mounted turning blocks, using through-bolted connections reinforced with custom-cut wooden inserts and fiberglass laminates.9:26 He replaces countersunk screws with hex-head bolts during the bonding process to ensure they remain removable after the epoxy cures.14:17

Se på YouTube

Mer fra Sailing Squib

Sailing Squib - May 2026/3sep. 2026Sailing Squib May 2026 /2aug. 2026Sailing Squib - Contemporary Witnessjuli 2026Sailing Squib - May 2026 /1juli 2026

Fra Sailing Squib – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem