Sailing Squibvideo

Squib's Refit - Deck work, superstructures, filling and sanding - filling in window frame corners/61

4 aprile 2024 · 15 min · 2K visualizzazioni

Cosa tratta questo video

Peter performs deck repairs and surface preparation on the pocket catamaran Squib, focusing on filling stress cracks and leveling uneven areas before painting. To address stress cracks in the gelcoat caused by underlying bulkheads, he previously reinforced the areas with multiple layers of fiberglass.0:47 For the current refit, he cleans the deck with acetone and applies a filler mixture of epoxy, microballoons, and Aerosil.2:38 He uses plastic sheeting to mold and smooth the epoxy in tight corners, allowing it to cure before sanding.4:34 To ensure a flat finish, he switches from an eccentric sander to a long-base orbital sander, which prevents the creation of new depressions during the leveling process.7:10 Additionally, he fabricates and installs wooden support pedestals for deck-mounted turning blocks, using through-bolted connections reinforced with custom-cut wooden inserts and fiberglass laminates.9:26 He replaces countersunk screws with hex-head bolts during the bonding process to ensure they remain removable after the epoxy cures.14:17

Guarda su YouTube

Altro da Sailing Squib

Sailing Squib - May 2026/3set 2026Sailing Squib May 2026 /2ago 2026Sailing Squib - Contemporary Witnesslug 2026Sailing Squib - May 2026 /1lug 2026

Da Sailing Squib — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema