RAN Sailingvidéo
This Is Where Boat Builds Break People - Ep. 501 Ran Sailing
28 août 2026 · 25 min · 99K vues · Skåne
Ce que couvre cette vidéo
Johan and Malin continue the fairing and lamination process on their boat build, focusing on the deckhouse, cockpit, and stern. To expedite the labor-intensive sanding of curved surfaces, Johan modifies a pneumatic dual-piston straight-line sander by attaching a flexible Flexisander base.12:17 The resulting tool proves too violent and vibrates excessively, leading him to revert to the original rigid base for flat areas while continuing to hand-sand curved sections.15:38 Lamination work involves applying two layers of carbon fiber followed by two layers of 600-gram biaxial fiberglass to the PET foam deckhouse interior.16:13 Johan also calibrates a CO2 laser cutter for precision work with plywood and acrylic.0:29 The project requires significant quantities of 407 low-density filler, with seven kilograms consumed during the current phase.24:20 The crew balances this repetitive construction work with hikes in Maglehem to maintain motivation during the long-term build.9:29
Plus de vidéos de RAN Sailing
De RAN Sailing — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



