Sea Gypsiesvídeo

Trying desperately to plug all the leaks

19 de outubro de 2017 · 2 min · 3K visualizações

O que este vídeo aborda

The crew of the Seeker prepares for departure as sea conditions deteriorate and wind shifts.Watch Maintenance tasks focus on securing the vessel for an upcoming passage, specifically addressing hull integrity. The team identifies multiple points of water ingress and prepares wooden plugs to seal these leaks permanently. They mix a batch of epoxy to bond the wooden panels into the hull, aiming to eliminate the leaks before getting underway. Additional preparations include securing the anchor, a task prioritized to avoid handling heavy ground tackle while at sea. The crew also discusses the logistics of using a bosun's chair for mast work, though they ultimately prioritize hull repairs over aloft maintenance due to the worsening weather.

Ver no YouTube

Mais de Sea Gypsies

Sea Gypsies: The Far Side of the World (full film)03/2026Sea Gypsies : The Plutonium Dome (Runit Dome Marshall Islands)01/2022Visiting the very remote island of Tikopia, in the Solomon Islands11/2017Whole lot of sailing (45 min of ASMR)10/2017

De Sea Gypsies — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema