Sailing Umavídeo

Making Uma Grey Again | Step 425

25 de janeiro de 2025 · 19 min · 135K visualizações

O que este vídeo aborda

The refit of the vessel Uma involves sealing 24 holes in the hull below the waterline, including former through-hulls, bilge drains, and rudder skeg drainage points.0:04 The crew grinds, cleans, and patches these perforations with fiberglass before applying a base coat of primer.0:10 Inside the hull, the team installs Oceanvolt motor flanges and mounts, reconfiguring the internal layout to split the battery banks into two separate compartments for improved safety and weight distribution.0:47 Initial concerns regarding battery bank dimensions—stemming from a measurement error in the project model—are resolved after verifying the actual space available.4:19 Following the structural work, the crew performs extensive fairing and sanding of the interior surfaces before applying a second, thicker coat of gray primer.8:57 The project remains ongoing, with future tasks including keel bolt maintenance and insulation installation.11:09

Ver no YouTube

Mais de Sailing Uma

Solar Sponsor Backed Out Before Sailing Around the World !09/2026Our boat won’t look the same after this | Step 49508/2026The ONE Thing We Disagreed on This Entire Refit | Step 49408/2026We Owe You The Full Story07/2026

De Sailing Uma — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema