Sailing Squibvídeo

Sailing - Squib's - Refit first day: Disaster

21 de agosto de 2025 · 16 min · 1K visualizações · Kuchelau, Vienna

O que este vídeo aborda

During a shakedown cruise on the Danube, the crew of the vessel Squib encountered multiple mechanical and electrical failures that forced an emergency return to the Kuchelau marina.0:02 After departing at 14:00, the starboard diesel engine failed to restart following a brief test, despite running properly the previous day.0:06 The crew attempted to rely on an electric outboard motor, but the unit’s 200-amp switch began to smolder under a 60-amp load, necessitating constant monitoring to prevent a fire.3:18 Navigation was further complicated by a four-hour delay at the Freudenau lock, which left the crew facing an arrival in an unfamiliar, unlit harbor after dark.10:16 Additionally, the crew discovered four centimeters of water in the bilge and found that the bilge pump failed to activate, potentially due to a faulty float switch.13:35 The crew also noted missing documentation and safety equipment, including the national flag and cleaning supplies.7:38 The day’s events highlighted the need for better labeling of the boat's 32 electrical switches and a more thorough inspection of fuel lines and bilge systems before attempting further travel.12:39

Ver no YouTube

Mais de Sailing Squib

Sailing Squib - May 2026 /410/2026Sailing Squib - May 2026/309/2026Sailing Squib May 2026 /208/2026Sailing Squib - Contemporary Witness07/2026

De Sailing Squib — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema