Sailing Miss Lone Starvídeo

How to rig a sailboat | SMLS S5E06

20 de agosto de 2017 · 19 min · 68K visualizações

O que este vídeo aborda

Professional rigger Mike Cipolla of Cipolla Spars and Rigging demonstrates the process of fabricating new standing rigging for the sailboat Miss Lone Star.2:01 The procedure utilizes a wire-technic rotary swage machine to cold-roll forge 3/16-inch stainless steel cable into aircraft-style fork fittings.2:30 Proper swaging requires a 10% reduction in the fitting's outside diameter to ensure structural integrity; insufficient reduction risks cable pull-out, while over-crimping can cause internal fitting failure.5:58 The process involves measuring the new cable against the old backstay, marking the swage line, and cutting the wire with Felco cutters.6:26 Cipolla emphasizes inspecting existing rigs for longitudinal or circumferential cracks in fittings, broken wire strands, and corrosion.9:54 He recommends applying passivization cream or metal wax to stainless steel fittings to prevent oxidation and maintain the protective chromium layer.11:05 The expert advises against over-engineering a vessel, suggesting that owners replace rigging to original design specifications rather than attempting drastic modifications.14:43

Ver no YouTube

Barcos neste vídeo

Formosa Yachts 51O barco deles

Mais de Sailing Miss Lone Star

We Sailed Into a Place Nobody Warned Us About EPS 31909/2026We Found Paradise. Then Everything Started Going Wrong.09/2026Why does this make me Nervous 08/2026Boat Owners Nightmare07/2026

De Sailing Miss Lone Star — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema