Sailing Catalpavídeo
Sailing Again after 543 days in a boatyard Ep 434
2 de fevereiro de 2025 · 24 min · 15K visualizações · Puerto Peñasco
O que este vídeo aborda
After 543 days in a boatyard in Puerto Penasco, the crew of the Catalpa departed for a shakedown cruise down the Sea of Cortez.5:31 During the initial 300-nautical-mile passage to Conception Bay, the crew encountered 35-knot gusts and significant following seas, which caused the spinnaker pole to bend at a 90-degree angle.7:25 The vessel averaged 8 to 10 knots during the two-day transit, arriving at the anchorage at 2:00 a.m. Post-yard maintenance revealed two primary mechanical issues: a cracked plastic fitting on the watermaker, which the crew repaired with JB Weld, and degraded watermaker membranes that reduced output from 40 to 27 gallons per hour.16:20 While attempting to relocate to a more protected anchorage within Conception Bay, the engine emitted significant white smoke and a burning odor, which the crew attributed to a slipping belt or injector issue.22:22 The crew opted to continue sailing south rather than investigate the engine further at that location.23:37
Mais de Sailing Catalpa
De Sailing Catalpa — veja o barco, a tripulação e todos os vídeos analisados do canal.
The Sailing Directory Newsletter
Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.



