Sailing Parlay Revivalvídeo

Salvage catamaran turns into Tattoo Parlour!

22 de novembro de 2020 · 16 min · 112K visualizações · Linton Bay Marina

O que este vídeo aborda

To repair structural bulkhead cracks on a hurricane-damaged Lagoon 450, the crew cuts away interior fiberglass panels and wood framing to expose the damaged areas.3:08 The team uses an oscillating multi-tool to minimize dust while cutting through fiberglass and bonded plywood.6:13 Inspection reveals that the original factory bonding paste failed to make contact with the deck, leaving the bulkhead floating and unsupported.9:45 The repair plan involves grinding the damaged fiberglass, applying epoxy reinforcement, and re-glassing the structural joints.8:07 To facilitate the work, the crew cuts access holes sized to the shoulders of the person performing the grinding.8:29 The boat is currently docked at Linton Bay, Panama, during the wet season, where the crew also manages risks from frequent lightning storms by disconnecting VHF antennas and N2K backbones.2:38 Logistics for parts are handled through a freight forwarding service, Mia to Panama, which ships items from Amazon via Miami.5:51

Ver no YouTube

Barcos neste vídeo

Lagoon 450O barco deles

Mais de Sailing Parlay Revival

Spontaneous trip to Canada to visit a special someone! - (Episode 379)08/2026Every Sailor Needs This Lightning Protection System! - Part 2 - (Episode 378)08/2026Installing the Ultimate Lightning Protection System! - Part 1 - (Episode 377)08/2026From Military Sniper to Sailing Around the World - (Episode 376)08/2026

De Sailing Parlay Revival — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema