Sailing Squibvídeo

Squib's Refit - Episode 28

29 de junho de 2023 · 17 min · 957 visualizações

O que este vídeo aborda

The refit of the pocket catamaran Squib focuses on deck preparation, painting, and hardware installation. The crew applies a two-component Epifanes primer and topcoat to the deck and arch, using a roller for the main surfaces and a brush for the edges.1:36 To avoid sanding between coats, they apply the second layer of primer within 24 hours of the first.2:19 The team also removes the Aries windvane from the stern to facilitate painting the arch and rear platform.4:16

Structural work includes filling gaps with an epoxy mixture thickened with microballoons and Aerosil, applied using a makeshift syringe.6:07 The crew plans to reroute halyards to the cockpit, marking positions for new rope clutches and turning blocks on the deck.10:22 Additional tasks involve removing temporary winter window covers to prepare the deckhouse for fairing, extracting a broken screw from a wooden joint, and installing new exhaust hoses with the aid of silicone spray.13:12 The project progresses toward finalizing the deck layout and sealing structural joints.

Ver no YouTube

Mais de Sailing Squib

Sailing Squib - May 26 Part 5 Starting to tailor the cockpit cover, water pump replacement starboard engine10/2026Sailing Squib - May 2026 /410/2026Sailing Squib - May 2026/309/2026Sailing Squib May 2026 /208/2026

De Sailing Squib — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema